Fast UK Delivery
Fast UK
Delivery
Trade Pricing Available
Trade Pricing
Available
Commercial & Public Sector Projects
Commercial & Public Sector Projects
Secure Payment System
Secure
Payment System
Product Description & Data Sheets

Once the 50x50 Retention Socket has been installed, the Traffic bollard is ready to be inserted into the socket. Using an Allen key, the plate covering the side chamber of the Retention Socket is removed. The compatible foot of the Traffic bollard is then inserted into the Retention Socket, a spanner is used to tighten the locking mechanism, which will then hold the Traffic bollard in the correct position. No further excavation will be required and you can simply, open the chamber, unlock the mechanism and insert a new bollard as and when required, in a matter of minutes.

The bollard is simply slotted into the Retention Socket and secured into place.

Product Specification

In stock

Retention Socket RS 50x50

SKU
sss0156
£79.99

On occasion installation cages used for the mounting of traffic bollards can be damaged during a vehicle impact, this can bend or even shear off the threaded sections used when installing the bollard. It is then often necessary to excavate, remove and replace these. Retention Sockets are flush to ground level therefore cannot be damaged in this way.

Due to the increased efficiency when implementing the changeover of a bollard into an existing Retention Socket, replacement may be able to be done with little or no traffic management. This should however be subject to a risk assessment by a suitably qualified person.

 

Any questions, please contact us here

Delivery Information: +

Estimated lead time: Lead time is between 3-28 days but can vary on specific products and quantities.

PLEASE NOTE: Lead times are an estimate. Orders placed today are subject to change dependent on material availability, courier workloads and staff situations.
Product Description & Data Sheets+

On occasion installation cages used for the mounting of traffic bollards can be damaged during a vehicle impact, this can bend or even shear off the threaded sections used when installing the bollard. It is then often necessary to excavate, remove and replace these. Retention Sockets are flush to ground level therefore cannot be damaged in this way.

Due to the increased efficiency when implementing the changeover of a bollard into an existing Retention Socket, replacement may be able to be done with little or no traffic management. This should however be subject to a risk assessment by a suitably qualified person.

 

Any questions, please contact us here

Once the 50x50 Retention Socket has been installed, the Traffic bollard is ready to be inserted into the socket. Using an Allen key, the plate covering the side chamber of the Retention Socket is removed. The compatible foot of the Traffic bollard is then inserted into the Retention Socket, a spanner is used to tighten the locking mechanism, which will then hold the Traffic bollard in the correct position. No further excavation will be required and you can simply, open the chamber, unlock the mechanism and insert a new bollard as and when required, in a matter of minutes.

The bollard is simply slotted into the Retention Socket and secured into place.

Product Specification

Delivery Information

Estimated lead time: Lead time is between 3-28 days but can vary on specific products and quantities.

PLEASE NOTE: Lead times are an estimate. Orders placed today are subject to change dependent on material availability, courier workloads and staff situations.
Bespoke Products & Bulk Discounts Available On Request
  • Recently Viewed
  • Popular Products

Once the 50x50 Retention Socket has been installed, the Traffic bollard is ready to be inserted into the socket. Using an Allen key, the plate covering the side chamber of the Retention Socket is removed. The compatible foot of the Traffic bollard is then inserted into the Retention Socket, a spanner is used to tighten the locking mechanism, which will then hold the Traffic bollard in the correct position. No further excavation will be required and you can simply, open the chamber, unlock the mechanism and insert a new bollard as and when required, in a matter of minutes.

The bollard is simply slotted into the Retention Socket and secured into place.

Product Specification

Bespoke Products & Bulk Discounts Available On Request
Customer Questions
No Questions
Please, mind that only logged in users can submit questions
Download Brochure

Download Our Brochure

If you prefer a copy of our product guide, you can download our brochure here full of our latest street furniture. From road bollards to shelters, cycle stands to seats and benches, we have a full range of solutions for all types of project. Find all the details you need and easily order online.

Retention Socket RS 50x50
Product Image